How much does a permit cost?

  • Each type of permit, building, electrical, plumbing, mechanical, grading, swimming pool, and miscellaneous, is charged a processing fee of $38.60.
  • Building permit fees are based on the valuation of the work to be done. Valuation is based on current construction cost estimates, provided through research conducted by model code organizations such as the International Conference of Building Officials (ICBO). The amount of a valid, executed contract may also serve as the determination of the valuation.
  • Electrical, plumbing, and mechanical permits are charged on a per item basis. For example, a plumbing permit will be charged $22.60 for each plumbing fixture; kitchen sink, water heater, toilet, shower, etc.; a mechanical permit will be charged $37.60 for each furnace, wall heater, floor heater, air conditioner, etc.; and electrical permits are charged fixed amounts for various installations such as services, sub-panels, appliances, etc. (except that electrical permits for new residential buildings are charged by a fixed amount per square foot).
  • Grading permit fees are based on the larger of the cut or fill volume in cubic yards.
  • Miscellaneous permits are issued for occupancy use changes, special events, legalization of units, and such. Fees not specifically listed in the fee schedule are charged on an hourly estimate.
  • Swimming pool valuations are calculated by a predetermined cost per square foot.